Please use this identifier to cite or link to this item:
                
    
    http://irepo.futminna.edu.ng:8080/jspui/handle/123456789/24080| Title: | PREDICTIVE MODEL DEVELOPMENT AND SIMULATION OF SOME PARAMETERS IN WASTE WATER A CASE STUDY OF THE SHELL PETR OLE Ulvl DEVELOPMENT COMPANY NIGERIA LIMITED, PORT HARCOURT (DIEBU CREEK FLOW STATION, BAYELSA SWAMP) | 
| Authors: | AJlBADE, FOLASHADE MUINAT | 
| Issue Date: | 2004 | 
| URI: | http://repository.futminna.edu.ng:8080/jspui/handle/123456789/24080 | 
| Appears in Collections: | Chemical Engineering | 
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| OCRENGR0179544.pdf | 1.95 MB | Adobe PDF | View/Open | 
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.