Search


Start a new search
Add filters:

Use filters to refine the search results.


Results 421-430 of 1636 (Search time: 0.005 seconds).
Item hits:
Issue DateTitleAuthor(s)
2018Stakeholders’ Perception on Performance Measures for Construction Partnering Projects in NigeriaOla-awo, Wasiu Adeniran; Roslan, Bin Amirudin; Bashir, Bashir Olanrewaju; Anifowose, Opeyemi Maroof
2021-06Critical success factors for effective internal construction stakeholder management in NigeriaOla-awo, Wasiu Adeniran; Alayande, Aisha; Ganiyu, Bashir Olanrewaju; Oyewobi, Luqman Oyekunle
2021-06UTILISATION OF ORDER PROCESSING TECHNOLOGY FOR LOGISTICS PROCESS IMPROVEMENT IN THE NIGERIAN CONSTRUCTION INDUSTRYYahaya, Isah; Winston, Shakantu; Saidu, Ibrahim
2021THE EFFECT OF POOR MATERIALS MANAGEMENT IN THE CONSTRUCTION INDUSTRY: A CASE STUDY OF ABUJA, NIGERIAAlbert, Idowu; Winston, Shakantu; Saidu, Ibrahim
2016The contributions of construction material waste to project cost overruns in Abuja, NigeriaSaidu, Ibrahim; Winston, Shakantu
2018Potentiality of the South African Construction SMME Contractors Globalising within and Beyond the SADC Construction MarketsAnugwo, I. C; Winston, Shakantu; Saidu, Ibrahim; Adamu, Anita
2011-03Evaluating rework cost- A study of selected building projects in Niger State, NigeriaOyewobi, Luqman Oyekunle; Ibironke, Olajide. T.; Ganiyu, Bashir Olanrewaju; Ola-awo, Wasiu Adeniran
2015-03Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in NigeriaSaidu, Ibrahim; Alumbugu, Polycarp; Abdulmumin, Abdulazeez; Ola-Awo, Wasiu
2017-03A Bespoke Approach for Relating Material Waste to Cost Overrun in the Construction IndustrySaidu, Ibrahim; Winston, Shakantu; Adamu, Anita, D.; Anugwo, I. C
2016A Conceptual Framework and a Mathematical Equation For Managing Construction Material Waste and Cost OverrunsSaidu, Ibrahim; Winston, Shakantu