dc.contributor.authorAgbo, Adakole Edwin-
dc.contributor.authorAyegba, Calistus-
dc.date.accessioned2026-04-29T14:08:08Z-
dc.date.available2026-04-29T14:08:08Z-
dc.date.issued2023-05-01-
dc.identifier.citationADAKOLE EDWIN , A. ., & CALISTUS , A. . (2023). MEASUREMENT AND ANALYSIS OF IMPACT OF SUPERVISION ON CONSTRUCTION LABOUR PRODUCTIVITY: A CASE STUDY OF NORTH-CENTRAL NIGERIA. BIMA JOURNAL OF SCIENCE AND TECHNOLOGY GOMBE, 7(01). https://doi.org/10.56892/bima.v7i01.404 pp 254 - 263en_US
dc.identifier.issn2536-6041-
dc.identifier.urihttp://irepo.futminna.edu.ng:8080/jspui/handle/123456789/30673-
dc.descriptionJOURNAL ARTICLEen_US
dc.description.abstractLabour productivity is one crucial factor that directly affect profitability of construction contracting firms. Labour productivity is one of the most important issues being frequently discuss among construction firms, construction professionals and stake-holders in the construction industry as it has a significant impact on performance of all construction projects. This study focuses on identifying supervision factors affecting labour productivity. The study analyses and quantify the impact of supervision on labour productivity in block laying and concrete activities in North-Central Nigeria. Questionnaire and direct site observation using time study was employed as data collection instrument. The data were analysed using relative importance index and regression model. The result of the analysis revealed that 7 factors were identified by Block layers and Concreters as factors under supervision group and significantly affect their productivity. The regression model result shows that in block laying, alteration of drawings and specifications during execution; Incompetent supervisors and late/unclear instructions were the top most factors having high negative impact (loss of productivity) of 0.745whr/m2; 0.637whr/m2 and 0.61whr/m2 respectively on labour productivity. In concreting, Inspection delay, supervision absentieesm, alteration of drawings and specifications during execution and incompetent supervisors were the 4 top most factors having high negative impact of 0.653whr/m2; 0.571whr/m2; 0.537whr/m2 and 0.518whr/m2 respectively on labour productivity. All the factors identified in this study have negative impact on labour productivity of the masonry trades considered in this study.en_US
dc.description.sponsorshipSELFen_US
dc.language.isoenen_US
dc.publisherpublished by Faculty of Science, Gombe State University (GSU), Nigeria since year 2017.en_US
dc.relation.ispartofseriesVOL. 7;1-
dc.subjectLabour Productivity;en_US
dc.subjectMasonry trades;en_US
dc.subjectBlock laying;en_US
dc.subjectConcretingen_US
dc.titleMEASUREMENT AND ANALYSIS OF IMPACT OF SUPERVISION ON CONSTRUCTION LABOUR PRODUCTIVITY: A CASE STUDY OF NORTH-CENTRAL NIGERIAen_US
dc.typeArticleen_US
Appears in Collections:Building

Files in This Item:
File Description SizeFormat 
MEASUREMENT AND ANALYSIS OF IMPACT OF SUPERVISION ON.pdfJOURNAL ARTICLE PDF177.83 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.