Please use this identifier to cite or link to this item: http://irepo.futminna.edu.ng:8080/jspui/handle/123456789/15764
Full metadata record
DC FieldValueLanguage
dc.contributor.authorIjigah, E. A.-
dc.contributor.authorOgunbode, Ezekiel Babatunde-
dc.contributor.authorIbrahim, M. O.-
dc.date.accessioned2022-12-21T14:45:05Z-
dc.date.available2022-12-21T14:45:05Z-
dc.date.issued2012-
dc.identifier.citationIjigah E. A., Ogunbode E. B., & Ibrahim M. O. (2012). Analysis and Prediction of Cost and Time Overrun Of Millennium Development Goals (MDGS) Construction Projects in Nigeria. Developing Country Studies. 2 (10)en_US
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/15764-
dc.description.abstractThe paper focuses on the analysis and forecast of cost and time overrun of MDGs construction projects in Nigeria. Twenty five MDGs construction projects from (2006-2009) were critically investigated and time and cost overrun of the project were studied. The Statistical Package for Social Scientists (SPSS) 19.0 version was used to analyse the variables using Paired t-test and simple regression at 95% confidence limits. The analysis was based on the adaptation of requisition method. The validity test on the efficiency of the model was highlighted using the confidence interval to enhance the application of the models. Mathematical models were developed. The findings shows that there is a significant different between the total contract sum, cost overrun, total contract duration, and time overrun for the MDGS projects. The study suggests acute need for government to engage in proactive strategic planning and approaches to keep construction project cost and time within reasonable limit for the actualization of MDGs policy of development and environmental sustainability.en_US
dc.language.isoenen_US
dc.publisherDeveloping Country Studies (IISTE)en_US
dc.relation.ispartofseries2(10);-
dc.subjectAnalysis and Predictionen_US
dc.subjectCost Overrunen_US
dc.subjectTime Overrunen_US
dc.subjectMillennium Development Goalsen_US
dc.subjectConstruction Projectsen_US
dc.titleAnalysis And Prediction Of Cost And Time Overrun Of Millennium Development Goals (MDGS) Construction Projects In Nigeriaen_US
dc.typeArticleen_US
Appears in Collections:Building



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.