Please use this identifier to cite or link to this item:
http://irepo.futminna.edu.ng:8080/jspui/handle/123456789/12017
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Abanda, F. H. | - |
dc.contributor.author | Musa, Musa Adamu | - |
dc.contributor.author | Clermont, P. | - |
dc.contributor.author | Tah, J. H. M. | - |
dc.contributor.author | Oti, A. H. | - |
dc.date.accessioned | 2021-07-29T00:07:23Z | - |
dc.date.available | 2021-07-29T00:07:23Z | - |
dc.date.issued | 2020-01 | - |
dc.identifier.citation | Abanda, F. H., Musa, A. M., Clermont, P., Tah, J. H. M., & Oti, A. H. (2020). A BIM-based framework for construction project scheduling risk management. International Journal of Computer Aided Engineering and Technology, 12(2), pp. 182-218.. | en_US |
dc.identifier.issn | 1757-2665 | - |
dc.identifier.uri | https://doi.org/10.1504/IJCAET.2020.105575 | - |
dc.identifier.uri | http://repository.futminna.edu.ng:8080/jspui/handle/123456789/12017 | - |
dc.description.abstract | The management of risks has been at the heart of most construction projects. Building information modelling (BIM) provides opportunities to manage risks in construction projects. However, studies about the use of BIM in risk management are sketchy with a lack of a systematic approach in using BIM for managing risk in construction projects. Based on existing risk models, this study investigated and developed a BIM-based framework for the management of construction project scheduling risk. Although, the frameworks were developed by mining risk management processes from Synchro and Vico, both being amongst leading 4D/5D BIM software systems, they can inform risk management in BIM projects that are supported by 4D/5D BIM software systems that contain risk management modules. The frameworks were validated for their syntactic and semantic correctness. | en_US |
dc.language.iso | en | en_US |
dc.subject | BIM | en_US |
dc.subject | Building Information Modelling | en_US |
dc.subject | Construction projects | en_US |
dc.subject | Risk | en_US |
dc.subject | Synchro | en_US |
dc.subject | Vico | en_US |
dc.subject | 4D/5D BIM | en_US |
dc.subject | Bizagi | en_US |
dc.subject | Scheduling software | en_US |
dc.subject | Process model | en_US |
dc.subject | Risk management software | en_US |
dc.title | A BIM-based framework for construction project scheduling risk management. | en_US |
Appears in Collections: | Project management Technology |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
abanda2020 BIM based framework.pdf | A BIM-based framework for construction project scheduling risk management. | 2.7 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.