Please use this identifier to cite or link to this item:
http://irepo.futminna.edu.ng:8080/jspui/handle/123456789/10446
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Saidu, Ibrahim | - |
dc.contributor.author | Winston, Shakantu | - |
dc.contributor.author | Idiake, John E. | - |
dc.contributor.author | Abdulkadir, U. | - |
dc.date.accessioned | 2021-07-18T16:17:06Z | - |
dc.date.available | 2021-07-18T16:17:06Z | - |
dc.date.issued | 2017 | - |
dc.identifier.uri | http://repository.futminna.edu.ng:8080/jspui/handle/123456789/10446 | - |
dc.language.iso | en | en_US |
dc.publisher | NIQS RECON 3 | en_US |
dc.relation.ispartofseries | ;638-650 | - |
dc.title | PROFESSIONAL'S PERCEPTION OF ON CONSTRUCTION MATERIAL WASTE AND COST OVERRUN AT THE DESIGN STAGE OF A PROJECT IN ABUJA, NIGERIA | en_US |
dc.type | Article | en_US |
Appears in Collections: | Quantity Surveying |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
recon 3saidu.pdf | 817.41 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.