Browsing by Subject Rework

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 1 to 9 of 9
Issue DateTitleAuthor(s)
2018-08Analysis of rework risk triggers in the Nigerian construction industryEze, Emmanuel Chidiebere; Idiake, John Ebhohimen; Ganiyu, Bashir Olanrewaju
2018-04-10Cost Implications of Rework Due to Design Errors in Institutional Building Projects in AbujaSalihu, Comfort; Adamu, Anita Dzikwi
2018-04-10Cost Implications of Rework Due to Design Errors in Institutional Building Projects in AbujaSalihu, Comfort; Adamu, Anita Dzikwi
2011The effect of project types on the occurrence of rework in expanding economyOyewobi, L. O; Oke, A. A.; Ganiyu, B. O.; Shittu, A. A.; Isa, R. B.; Nwokobia, L
2011-06The effect of project types on the occurrence of rework in expanding economyOyewobi, Luqman Oyekunle; Oke, Abdulganiyu Adebayo; Ganiyu, Bashir Olanrewaju; Shittu, Abdullateef A.; Isa, Rasheed B.; Nwokobia, Lynda
2011-03Evaluating rework cost- A study of selected building projects in Niger State, NigeriaOyewobi, Luqman Oyekunle; Ibironke, Olajide. T.; Ganiyu, Bashir Olanrewaju; Ola-awo, Wasiu Adeniran
2011Evaluating rework cost- A study of selected building projects in Niger State, NigeriaOyewobi, Luqman Oyekunle; Ibironke, Timothy O.; Ganiyu, Bashir Olanrewaju; Ola-awo, Wasiu Adeniran
2016Projects Management and the effect of Rework on Construction Works: A Case of selected Projects in Abuja Metropolis, NigeriaAbeku, D. M.; Ogunbode, Ezekiel Babatunde; Salihu, C.; Maxwell, S. S.; Kure, M. A.
2018-04REWORK RISKS TRIGGERS IN THE NIGERIAN CONSTRUCTION INDUSTRY: A VIEW OF BUILT ENVIRONMENT PROFESSIONALSEze, Emmanuel Chidiebere; Idiake, John Ebhohimen; Ganiyu, Bashir Olanrewaju